River Usk Arch Bridge Design, Newport
Design and checking of major temporary works
associated with the lifting of the arch sections and launch of the deck. |
 |
Doncaster North Railway Bridge
Design and checking of temporary works used
during the reconstruction of the existing highway bridge over 7 rail lines.
The novel erection scheme involved
construction of the new deck above the existing bridge and removal of the
existing deck on underslung runway beams. Finally the bridge was jacked down
3m using Powerlift units during short overnight rail possessions. |
 |
Holyhead RoRo Modifications
Design of modifications widening the link span
and allowing the use of larger ferries. |
 |
Float Viaduct
Design of spreader beams to enable the 3 main
girders to be lifted as a four point lift. |
 |
West Coast Main Line (WCML) Footbridges
Design of 17 footbridges which replaced
existing level crossings over the main line. |

 |
Rio Isabela Bridge, Dominican Republic
Project management for design, procurement,
shipping, and erection scheme details. |
 |
M65 Stanworth Valley Viaduct, Blackburn
Supervision of temporary works design for
launch of bridge steelwork. |
 |
Marsh Mills Viaducts, Plymouth
Sales Director for Fairfield-Mabey during award
of subcontracts for structural steelwork.
Closely involved in Hochtief’s tender team for the Marsh Mills slip roads
slide-in. |
 |
Docks Crossing, Canary Wharf
Conception of erection scheme using floating
crane to lift beams into place during night time occupations of the
Docklands Light Railway. |
 |
A406 Ilford Flyover, London
Commercial Manager at Fairfield-Mabey
responsible for estimating and negotiation of steelwork subcontracts. |
 |
Workington Dock
Relocation of dockside crane using wheeled
transporters and military trestling. |

 |
Menai Suspension Bridge
Site Agent for Major Maintenance Contract which
included measurement of hanger loads, changing hanger pins, upgrading
gantries and accesses, concrete repairs, and blast cleaning and/or painting
the entire structure. |

 |
Old Ford Road Rail Underbridge, London
Design of temporary works comprising panel
(Bailey type) bridge sections and military trestling. These supported the
rail tracks and slide path during the bridge slides.
An unusual aspect to the scheme was the
use of 61m span trusses to support the rail tracks during ground excavation.
The trusses comprised 1.5m deep standard panel bridge components which were
supported on railway wagons, preassembled and delivered from a rail yard
several miles away. |
 |
Humber Bridge
Analysis of
the geometry of the cables and deck for both the permanent works and during
the construction phase. The analysis of geometry during the construction
phase was a complex process which required the use of a non-linear plane
frame computer program to model the cable geometry and gaps between deck
boxes.
(Click
here for a recent simulation
using FE methods). |
 |
Humber Bridge
Design of temporary works for the tower top platforms, deck lifting
attachments, and a temporary bridge over the main line railway used to
support and transfer the deck sections prior to lifting. |