Temporary Works Design Chris Booth has vast experience of developing erection schemes and designing temporary works, having been personally involved with many of the major short and medium span steel bridges erected in the UK over the last 25 years. Having worked with various contractors and fabricators, he is acutely aware of the requirement for schemes to be simple, economical, and to offer programme benefits wherever possible. A number of the projects with which he was associated were awarded contracts as a direct result of innovative erection schemes offering reductions in cost, risk, and time. The pictures on the page together with those in the Gallery show a few of the projects with which he has been associated. We offer a service to contractors and fabricators, carrying out design and/or checking of temporary works and erection schemes.
Analysis Analysis of deflections and stresses at various stages during the erection of bridges and structures.
Temporary Works Design General temporary works design for access, lifting, moving, restraint, and support.
Erection Schemes Erection schemes of all types for bridges and special structures.
Independent Checking Independent checking and certification of erection schemes and temporary works.
Please contact us to discuss any requirements you have.
|
|
All comments or queries welcomed
at
info@chris-booth.com - © Chris Booth Associates Ltd 2006
- Best viewed in IE
or compatible browser |